Electrical wiring

Electrical wiring in Nairobi: new installations, rewiring and fault-finding

From a new-build house to an older property that trips breakers, we plan the circuits, run the cable and test every connection before sign-off, so the system is safe now and easy for the next electrician to understand.

Electrical wiring work

Quick answer

Ultrateq Systems provides electrical wiring in Nairobi, Kenya: first-fix and second-fix wiring for new buildings, full or partial rewiring of older properties, distribution board upgrades, earthing, lighting and socket circuits, and fault-finding for tripping breakers and dead circuits. Work is planned from a site visit, installed neatly and tested.

Who this is for

  • Developers and homeowners building or finishing a house or apartment
  • Owners of older buildings with old wiring, tripping breakers or no earthing
  • Shops, restaurants and offices fitting out new premises
  • Landlords and property managers fixing recurring faults
  • Anyone adding solar, a generator or air conditioning who needs the wiring upgraded first

What's included

  • First-fix and second-fix wiring for new builds
  • Full and partial rewires of older properties
  • Distribution board and consumer unit upgrades
  • Lighting, socket and dedicated appliance circuits
  • Earthing and bonding, RCD and surge protection
  • Fault-finding: tripping breakers, dead circuits, burning smells
  • Commercial fit-out wiring for shops and offices
  • Testing of finished circuits before handover

Why choose this service

Safer buildings

Correct cable sizing, protective devices and earthing reduce the risk of overheating, shock and fire.

Fewer faults

Neat terminations and tested circuits prevent the nuisance tripping and dead sockets that come from rushed work.

Easier maintenance

A labelled distribution board and clear circuit layout save time and money on every future job.

Ready for upgrades

We leave capacity for solar, generator changeover and added loads where you plan them.

How we work

  1. 1

    Site visit and brief

    We walk the property, discuss your loads and future plans, and review any drawings.

  2. 2

    Layout and materials list

    Circuits, points and distribution boards are planned and cables and fittings are specified.

  3. 3

    First fix

    Conduits, trunking and cables are installed before plastering or finishing.

  4. 4

    Distribution board

    Breakers, RCDs and surge protection are installed and circuits labelled.

  5. 5

    Second fix

    Sockets, switches and light fittings are installed once finishes are done.

  6. 6

    Testing and handover

    Each circuit is tested, the system is energised and we walk you through the board.

Wiring in pictures

What affects the price

  • Number of lighting, socket and appliance points
  • Concealed (in-wall) or surface conduit and trunking
  • Cable size and type needed for each circuit
  • Size and quality of the distribution board and protective devices
  • Building size, number of floors and access
  • Whether it is new work or a rewire in an occupied building

Wiring is usually quoted per project from a site visit, because points, cable runs and finishes vary widely. We provide an itemised quotation so you can see materials and labour separately.

Ask for a quote

Frequently asked questions

Why does my breaker keep tripping?

The usual causes are an overloaded circuit, a faulty appliance, a short circuit, an earth leakage fault, damp or a loose connection. Do not replace the breaker with a larger one. Read <a href="/blog/why-does-my-breaker-keep-tripping/">Why does my breaker keep tripping?</a> or call us to diagnose it.

How do I know if my house needs rewiring?

Warning signs include frequent tripping, warm or discoloured sockets, burning smells, flickering lights, no earthing, brittle cable insulation and an old board with rewirable fuses. See <a href="/blog/signs-your-house-needs-rewiring/">Signs your house needs rewiring</a>.

Can you rewire an occupied house?

Yes. We plan the work in stages, so you can keep using parts of the property, and test each circuit as we go.

Do you wire buildings that are still under construction?

Yes. First-fix wiring is done before plastering and second-fix after finishing. We coordinate with your contractor to match the building schedule.

Do you install earthing and RCD protection?

Yes. Earthing, RCD protection and surge protection are part of a correct installation. Read <a href="/blog/earthing-and-rcd-protection-explained/">Earthing and RCD protection explained</a>.

Can you wire a house for solar or a generator?

Yes. We can separate essential circuits, install changeover switching and prepare the distribution board so solar or a generator can be added cleanly.

Talk to us about wiring

Call, WhatsApp or send your details and we'll respond with a plan and a price.